FINE QUALITY PROJECT
Supporting Project for the Yuelai Stream Scenic Spot in Shihu
Winning Time:2021-2022yearSupporting Project for the Yuelai Stream Scenic Spot in Shihu
Winning Time:2021-2022year
Curtain Wall Project of the First Stage of the Upgrading and Transformation Project for Suzhou Municipal Solid Waste Incineration Power Generation Plant
Winning Time:2021-2022yearCurtain Wall Project of the First Stage of the Upgrading and Transformation Project for Suzhou Municipal Solid Waste Incineration Power Generation Plant
Winning Time:2021-2022year
Suzhou Metro Line 3
Winning Time:2021-2022yearThe decoration project of section 8 of Suzhou Rail Transit Line 3 has a construction area of 58,308.36 square meters. The project has a frame structure and consists of two underground floors - the first and the second. This project is a public building located in the Suzhou Industrial Park, Jiangsu Province. The decoration project of section 8 of Suzhou Rail Transit Line 3 includes public areas with porcelain enamel aluminum panel walls, aluminum alloy round and square ceilings, terrazzo flooring, as well as equipment areas with ceramic tile walls, latex paint walls, and stone-clad, aluminum square and single-board ceilings at the entrances and exits.
Project Name: Suzhou Rail Transit Line 3 SRT3-12-8 Section
Awarded Year: 2021-2022
Suzhou Metro Line 3
Winning Time:2021-2022year
Grand Hyatt Hotel Interior Decoration Project
Winning Time:2021-2022yearThe Zhonghui Pullman Hotel Decoration Project (Phase II) has a construction area of approximately 46,700 square meters. It has a frame-shear wall structure, with 3 floors underground and 25 floors above ground. The project started on July 6, 2018 and was completed on July 28, 2019. Located at the east of Xiangcheng Avenue and north of Jiayuan Road in Suzhou, it is a first-class hotel building in Xiangcheng District, Suzhou, Jiangsu Province. The main construction contents include installation of stone materials and carpets, wood veneer installation, hard package installation, stainless steel installation, and hardware installation.
Project Name: Zhonghui Pullman Hotel Decoration Project (Phase II)
Award Time: 2021-2022
Grand Hyatt Hotel Interior Decoration Project
Winning Time:2021-2022year
Interior Decoration Project of China General Nuclear Power Corporation Suzhou Technology Building
Winning Time:2019-2020yearThe interior decoration project of China General Nuclear Power Corporation's Suzhou Technology Building has a construction area of 90,260 square meters with a frame structure, consisting of 2 underground floors and 23 above-ground floors. It is a first-class office space in Suzhou, Jiangsu Province with an advantageous geographic location. The project is divided into six buildings: A, B, C, D, E, and F, among which A building is the main building. The construction scope includes light steel keel gypsum board with latex paint and aluminum plate ceiling, as well as floor materials such as stone, tiles, all-steel network raised floor, and carpet. Wall materials include dry hanging stone, wall tiles, honeycomb aluminum plate, and latex paint.
Project Name: Interior Decoration Project of China General Nuclear Power Corporation's Suzhou Technology Building
Award Time: 2019-2020
Interior Decoration Project of China General Nuclear Power Corporation Suzhou Technology Building
Winning Time:2019-2020year
Suzhou Metro Line 4
Winning Time:2019-2020yearSuzhou Metro Line 4
Winning Time:2019-2020year
Interior Decoration Project of the Business Office Building of Suzhou Branch Campus of Agricultural Bank of China Limited
Winning Time:2017-2018yearInterior Decoration Project of the Business Office Building of Suzhou Branch Campus of Agricultural Bank of China Limited
Winning Time:2017-2018year
Interior Decoration Project of Suzhou Guangji Hospital
Winning Time:2017-2018yearThe total construction area of the interior decoration project of Suzhou Guangji Hospital is approximately 106,439 square meters, consisting of two underground floors and eleven above-ground floors. It is a high-end hospital in Suzhou, Jiangsu Province. The project is divided into three separate buildings: an emergency building, an inpatient building, and a logistics building. The main construction contents include light steel keel gypsum board latex paint suspended ceilings, floor tiles, anti-static active floor, solid wood composite floor, dry-hanging stone wall, wall tiles, decorative panels, and wood veneer surfaces.
Project Name: Interior Decoration Project of Suzhou Guangji Hospital
Awarded Year: 2017-2018
Interior Decoration Project of Suzhou Guangji Hospital
Winning Time:2017-2018year
Shanghai International Aviation Service Center
Winning Time:2021-2022year
X-1A is an aviation material supply center with 7 above-ground floors and 3 underground floors. The building is 54.5m high and covers an area of 47,270.78 square meters on a site of 8,028.22 square meters. X-1B is a high-rise tower for aviation-related services with 39 above-ground floors and 3 underground floors. The building is 200m high and covers an area of 92,369.59 square meters on a site of 4,917.62 square meters. The tower is a frame-shear wall structure with a height of approximately 200m (194.38m from the top of the steel column to the top). The thickest steel plate used is 50mm, and the total amount of steel used is approximately 10,213 tons.
The steel structure of the tower adopts a core-tube and steel frame structure. The bottom of the outer steel frame is at an elevation of -16.3m, and the top is at an elevation of 194.38m. Due to the characteristics of the project and the lifting capacity of the tower crane, the above-ground steel columns are divided into sections of two or three floors. The core tube and outer frame structure adopt a "synchronous climbing at different heights" method for continuous construction. The lower part of X-1B tower adopts a freeform curved grid structure, which is about 176m in length and 12-50m in width. The maximum installation height of the steel grid is 79.25m, and the total projected area is about 5604 square meters.
Project Name: Shanghai International Aviation Service Center (X-1) Land Project
Award Time: 2021-2022
Shanghai International Aviation Service Center
Winning Time:2021-2022year
ABB Xiamen Industrial Center Project
Winning Time:2020-2021yearABB Xiamen Industrial Center Project
Winning Time:2020-2021year
GaoYou People's Hospital (East Area)
Winning Time:2022yearGaoYou People's Hospital (East Area)
Winning Time:2022year
Suzhou Industrial Park Sports Center
Winning Time:2019yearSuzhou Industrial Park Sports Center
Winning Time:2019year
Canada's Mount Wutai Grand Buddha Hall Project
Winning Time:2022yearCanada's Mount Wutai Grand Buddha Hall Project
Winning Time:2022year
Nanjing University of Aeronautics and Astronautics Suzhou Affiliated Middle School (Xinghu Street Campus)
Winning Time:2021yearNanjing University of Aeronautics and Astronautics Suzhou Affiliated Middle School (Xinghu Street Campus)
Winning Time:2021year
Tongcheng Network Data R&D Center Office Building Project
Winning Time:2021yearTongcheng Network Data R&D Center Office Building Project
Winning Time:2021year
Canada is Mount Wutai Grand Buddha Hall Project
Winning Time:2020yearCanada is Mount Wutai Grand Buddha Hall Project
Winning Time:2020year
Chunshenhu Road Rapid Transformation Project
Winning Time:2022yearChunshenhu Road Rapid Transformation Project
Winning Time:2022year
Suzhou Rail Transit Line 3 Project - Station Mechanical and Electrical Installation and Decoration Construction Project (Batch 2)
Winning Time:yearSuzhou Rail Transit Line 3 Project - Station Mechanical and Electrical Installation and Decoration Construction Project (Batch 2)
Winning Time:year
Suzhou Rail Transit Line 3 Project - Station Mechanical and Electrical Installation and Decoration Construction Project (Batch 1)
Winning Time:2020yearSuzhou Rail Transit Line 3 Project - Station Mechanical and Electrical Installation and Decoration Construction Project (Batch 1)
Winning Time:2020year
Suzhou Science and Technology City Hospital and Public Health Center Civil and Installation Engineering Project
Winning Time:2019yearSuzhou Science and Technology City Hospital and Public Health Center Civil Installation Project has a total construction area of 162,772.9 square meters, mainly consisting of the inpatient building, medical technology building, cafeteria and dormitory, infectious disease ward building, logistics building, liquid oxygen station, and guardhouse. The inpatient building is an 11-story high-rise building with two underground floors, with a building height of 51.9 meters and a standard floor height of 3.9 meters. The medical technology building is a four-story or five-story building with two underground floors and a building height of 23.4 meters. The total cost of the installation project is CNY 190 million.
This project is mechanical and electrical engineering includes three sub-divisions: electrical, plumbing and drainage, and ventilation and air conditioning. The electrical engineering includes power supply lines, electrical power, electrical lighting, backup power supply, lightning protection, and grounding device systems. The plumbing and drainage and heating system include indoor and outdoor water supply and drainage, solar hot water system, outdoor heating system, etc. The ventilation and air conditioning system includes air supply and exhaust system, smoke exhaust system, air conditioning water system, VRV system, air-cooled and water-cooled heat pump system.
Construction Unit: Suzhou Science and Technology City Social Service Center;
Contracting Unit: Zhongyifeng Construction Group Co., Ltd.
Project Name: Suzhou Science and Technology City Hospital and Public Health Center Civil Installation Project
Award Year: 2019
Suzhou Science and Technology City Hospital and Public Health Center Civil and Installation Engineering Project
Winning Time:2019year
Suzhou Rail Transit Line 2 Taiping Depot Mechanical and Electrical Installation Project
Winning Time:2015yearSuzhou Rail Transit Line 2 Taiping Depot Mechanical and Electrical Installation Project
Winning Time:2015year
Suzhou Science and Technology City Hospital
Winning Time:2018yearThe hospital project of Suzhou Science and Technology City is located in the Science and Technology City of the High-tech Zone. At the junction of S230 Provincial Road and Wuyishan Road, it is a three-level comprehensive public hospital integrating medical treatment, teaching, scientific research, rehabilitation and prevention. The total building area of the project is 162772.9 m_and it mainly consists of ward building, outpatient medical technology building, canteen, infectious ward building, logistics building and liquid oxygen station. The project has two floors underground, 11 floors above the ward building, 51.9 m in height, 3.9 m in standard floors, and 2.34 m in height, with a total cost of 1.6 billion yuan. It has won the first prize and two-star green building of Beijing Excellent Engineering Survey and Design Award, three national utility model patents, one provincial engineering law, the Yangtze Cup of Jiangsu Quality Engineering Award in 2017, the second batch of Jiangsu Standardized Civilization Demonstration Sites in 2015, the demonstration project of Jiangsu New Technology Application, the third prize of QC Group achievements, two Provincial papers, and two Jiangsu Construction Fittings in 2016. Decoration industry science and technology innovation awards and other honors.
Suzhou Science and Technology City Hospital
Winning Time:2018year
7 # Building, Block D, Suzhou Central Plaza (W Hotel)
Winning Time:2018yearThe W Hotel is located in the north of Suxiu Road, south of Suhui Road, west of Xingyang Street and east of Xinggang Street in Suzhou Industrial Park. With its ornament, the industrial park looks more gorgeous and dazzling. The hotel with a construction area of about 95,000 square meters consists of 3-storey underground parking lot, equipment room and 38 floors above ground. The building height reaches 168 M. The 1st to 4th floors are mainly lobbies and conference halls, the 5th to 10th floors are Hotel apartments, the 11th to 33rd floors are guest rooms, and the 34th to 38th floors are restaurants, swimming pools and functional rooms. W Hotel has successfully applied 10 major and 28 minor construction technologies, 4 major and 10 minor Jiangsu new technologies.
7 # Building, Block D, Suzhou Central Plaza (W Hotel)
Winning Time:2018year
Suzhou Modern Media Plaza
Winning Time:2018yearThe project has a total floor area of 330,000_, three floors underground, 43 floors of office building, 214.8 meters high, core tube steel frame structure; 38 floors of hotel building, 164.9 meters high, steel frame stiff structure outside core tube, which was completed on July 2, 2012 and July 27, 2015. The project has the following technical characteristics: construction of deep and large foundation pit adjacent to Metro in soft soil area, construction of main structure of super high-rise building, installation of overhead corridor of multi-storey steel truss with rigid connection at both ends of settlement joint, installation of catenary steel roof with large height difference, etc.
Suzhou Modern Media Plaza
Winning Time:2018year
Steel Structural Engineering of Inner Circle and Atrium of Suzhou Central Project
Winning Time:2016-2017yearThe steel structure of Suzhou Central Project is mainly composed of atrium truss structure, atrium decorative tree, skating rink roof and bird-shaped roof. The atrium truss structure is a multi-storey, large-span, primary and secondary plane truss structure with a maximum span of 53.1 meters and a maximum installation elevation of 38.5 meters. It is connected with the foundation cap through 12 groups of truss columns. The large bird-shaped roof structure is mainly composed of roof grid, tree-shaped support column, V-shaped support column and lateral horizontal support bar. The box section steel is used in the roof grid members, and the steel tube joint is used in the connection between the member and the member, and the steel tube joint is welded between the member and the member. Tree columns and V-shaped columns are all supporting structures supporting roof grids, and all of them are steel tube structures. The bottom of the column is connected with the top of the column in the concrete floor, and the column branches are connected with the grid nodes through different forms such as articulation or rigid connection. The lateral horizontal support bar mainly supports the elevation grid structure. One end is connected to the structure floor by buried parts, and the other end is connected to the grid structure.
Steel Structural Engineering of Inner Circle and Atrium of Suzhou Central Project
Winning Time:2016-2017year
Steel Structure Engineering of Modern Media Plaza Project
Winning Time:2015-2016yearInstallation of flexible steel catenary roof with large height difference and high height in atrium of this project office building. Installation and construction of 2300t giant truss at high altitude under differential settlement conditions at both ends. The construction and installation of mega-truss connection between main and auxiliary buildings under the condition of large differential settlement and unstable settlement can solve the problems of large volume, heavy components, complex structure, overhead installation, etc. At the same time, the problem of additional stress in steel structure truss caused by uneven settlement of shelf points at both ends should also be solved. Components with large cross-section size, irregular joints, large weld volume of steel pipe (steel bar) intersecting line, high installation accuracy requirements, various and complicated forms of steel castings, application of lead rubber bearings, strict control of pre-stressed steel structure.
Steel Structure Engineering of Modern Media Plaza Project
Winning Time:2015-2016year
Outerwear of Yongwang Mengle City Project
Winning Time:2015-2016year
China Architectural Engineering Decoration Award 2015-2016: Outerwear of Yongwang Mengle City Project
The building area of the project is 153000_, with frame structure, one floor underground, three floors above ground and four floors in part. The total investment of the project is RMB 600 million, and the total cost of curtain wall is 112.293 million yuan. The project is a large commercial building, located in Suzhou, Jiangsu Province, with an advantageous geographical position. Yongwang Mengle City Curtain Wall Project includes glass curtain wall, stone curtain wall, aluminium curtain wall, pottery curtain wall, aluminium alloy grille and aluminium alloy doors and windows. The total area of the curtain wall is about 60,000 square meters.
Outerwear of Yongwang Mengle City Project
Winning Time:2015-2016year
Decoration and Decoration Project of Suzhou New Construction Project of Xinyue Department Store
Winning Time:2016-2017year
China Architectural Engineering Decoration Award 2016-2017: New Project Decoration and Decoration Project of Xinyue Department Store in Suzhou-
In the overall architectural and landscape design, the project has been running through the unique cultural artistic conception and garden art of Suzhou. Its diversity, richness, humanism and art, natural ecological perfect space integration, to provide customers with a delicate shopping, enjoy a good place to live.
Decoration and Decoration Project of Suzhou New Construction Project of Xinyue Department Store
Winning Time:2016-2017year
Yuqintang Taicang
Winning Time:2016-2017year
2016-2017 China Architectural Engineering Decoration Award: Taicang Yuqin Ting 7 #, 8 #, 10 # Building Fine Decoration Project
The project is a high-rise hardbound apartment developed by Japan's Waterlogged Residence. With the theme of healthy housing, more Japanese new materials, new technologies and new construction management methods are adopted, which reflects the culture and integration of housing industry. Obtain national patent and grade work law.
Yuqintang Taicang
Winning Time:2016-2017year
Suzhou Rail Transit Line 2
Winning Time:2015-2016year
China Architectural Engineering Decoration Award 2015-2016: Mechanical and Electrical Installation and Decoration Construction Project of Main Line Station of Suzhou Rail Transit Line 2 Project
This project is the "Heaven Cup" and "National Excellence" projects of the city's high-quality projects. Using glazed glass and enamel steel plate, color and pattern are combined, and the theme concept is "Water Village Colorful Rhyme" to display the unique charm of Suzhou.
Suzhou Rail Transit Line 2
Winning Time:2015-2016year
Tramway Line 1 Project in Suzhou High-tech Zone
Winning Time:2015year
I. General situation of the project
Tram Line 1 in Suzhou High-tech Zone is the first tram line in Suzhou High-tech Zone. There is a depot and a control center on the whole line, with a total investment of RMB 3.149 billion.
The total length of the project is 18.19 Km. The east-west direction of the line runs through the high-tech zone. It connects the ecological city and the science and Technology City in Binhu District, the Hushuguan Economic Development Zone in Yangshan District, the Fengqiao Street and Shishan Street in the central city area, and transfers between the terminal station of Suzhou Paradise Station and the rail transit line 1 and the planned rail transit line 3.
Tramway Line 1 Project in Suzhou High-tech Zone
Winning Time:2015year
Jinchang elevated
Winning Time:2014year
I. General situation of the project
The project starts at the west side of Hufu Road intersection and ends at the west side of 312 National Highway intersection with a total length of 0.611 km. The whole project is mainly composed of four parts: elevated expressway reconstruction, ground auxiliary road, ramp approach slope and temporary connecting road.
II. Highlights of Engineering
In the demolition of the anti-collision guardrail of the old bridge in the project, the construction methods of wire saw cutting and crane hoisting are adopted to ensure the safety of the existing bridge structures.
Jinchang elevated
Winning Time:2014year
Ganjiang Road Comprehensive Renovation Municipal Road Section 1
Winning Time:2013year
1. General situation of the project:
Ganjiang Road is located in the central part of Suzhou City, with a total length of 7.1Km. It is an important transportation trunk road connecting Suzhou High-tech Zone and Industrial Park. The main contents of the project are: 256000 square meters of fast and slow lane construction; 83000 square meters of pavement on sidewalks; 45,000 meters of flank stones; 3 new bridges, and all the rest are repaired. Restoration of the four sections of Bachelor's Street-Nurturing Lane, Heqiao-Chengyuqiao due to track construction landfill channel, renovation of bank revetment, partial addition of railings.
Ganjiang Road Comprehensive Renovation Municipal Road Section 1
Winning Time:2013year
Suzhou Shihu Landscape Nanshihu Infrastructure Construction Project
Winning Time:2013year
1. General situation of the project:
The project is located in the southeast corner of Shihu scenic area, adjacent to Youxin Elevation in the East and Wuzhong Avenue in the south. The project includes six roads, three barges, nine bridges and landscape greening at the entrance of South Square. Seven of them are porous arch bridges, all of which adopt composite arch rings. Two are girderless slab bridges. The pipelines built by the project are all located in the Shihu scenic area, which is surrounded by the Shihu scenic area for one week. The project cost is 86 million yuan.
Suzhou Shihu Landscape Nanshihu Infrastructure Construction Project
Winning Time:2013year
West Extension Project of Wujiang People's Road
Winning Time:2012year
I. General situation of the project
This project is the East-West urban trunk road of Wujiang City and an important urban trunk line of Binhu New Town. The total length of the road is about 3740 meters, with a planned width of 44 meters, two-way 6 lanes and three new simply supported girder bridges. The project starts at Wumou Road intersection in the East and reaches the new embankment in Taihu Lake in the west, with an investment of about 180 million yuan.
West Extension Project of Wujiang People's Road
Winning Time:2012year
Fuling Road
Winning Time:2012yearFuling Road
Winning Time:2012year
Station Front Plaza Project of Suzhou New District of Shanghai-Nanjing Intercity Railway
Winning Time:2011year
I. General situation of the project
The project covers an area of about 140,000 square meters. It covers Jinqiao Road in the north, Hulian Road in the south, Pailou Road in the East and Suhu Road in the west. It can be summarized as "two roads, two stations and one square", namely Jinqiao Road, Hulian Road, social vehicle parking station, the first and last stop of public transport, and Central Landscape Square.
Station Front Plaza Project of Suzhou New District of Shanghai-Nanjing Intercity Railway
Winning Time:2011year
Suzhou International Expo Center Phase III
Winning Time:2017yearThe third phase of Suzhou Expo Center (Pavilion 1 and Pavilion 2) is located in the south of Modern Avenue, the east of Guanfeng Street and the north of Cuiyuan Road. It is a large-scale exhibition complex with exhibition, conference, hotel, leisure and integration. Its building area is about 159,000 feet, and its ground area is about 65,000 feet, with an area of 94,000 feet above ground and two basement floors. The span of steel truss is 90 cm.
Suzhou International Expo Center Phase III
Winning Time:2017year
Suzhou Modern Media Plaza
Winning Time:2016yearThe project has a total floor area of 330,000_, three floors underground, 43 floors of office building, 214.8 meters high, core tube steel frame structure; 38 floors of hotel building, 164.9 meters high, steel frame stiff structure outside core tube, which was completed on July 2, 2012 and July 27, 2015. The project has the following technical characteristics: construction of deep and large foundation pit adjacent to Metro in soft soil area, construction of main structure of super high-rise building, installation of overhead corridor of multi-storey steel truss with rigid connection at both ends of settlement joint, installation of catenary steel roof with large height difference, etc.
Suzhou Modern Media Plaza
Winning Time:2016year
New Complex Building of Industrial Park of Suzhou Mobile Branch
Winning Time:2015yearThe total construction area of the project is 84181, which is composed of main building and skirt building. Among them, the above-ground building area: 60 520 feet, underground 2 floors, above-ground 21 floors, building height of about 100 meters, started on August 11, 2011, completed on July 15, 2014. Ten new technologies (8, 23) have been applied in the construction industry. The exterior facade of the project is a hyperboloid curved glass curtain wall with an area of about 4100 square meters. The roof of skirt building is composed of photovoltaic glass roof and four open glass skylights. The energy saving effect is remarkable.
New Complex Building of Industrial Park of Suzhou Mobile Branch
Winning Time:2015year
Production, Operation and Dispatching Comprehensive Housing of Suzhou Power Supply Company
Winning Time:2013yearThe production, operation and dispatching integrated house of Suzhou Power Supply Company is located on the south side of Suzhou Labor Road and on the east side of the power plant circuit, with convenient transportation. The total construction area of the project is about 51700_, of which 22 floors are on the upper part of the main building, 29015_is on the ground floor, the second floor is on the ground floor, and the building area is 10230. It is a comprehensive building responsible for power supply dispatch, office and conference in five counties and cities of Suzhou.
Production, Operation and Dispatching Comprehensive Housing of Suzhou Power Supply Company
Winning Time:2013year
Suzhou Taihu Forum International Conference Center
Winning Time:2010yearTaihu Cultural Forum International Conference Center is located in Taihu Holiday Resort, Suzhou City. It is a national permanent cultural industry base integrating forum and exhibition. Contracted by Suzhou Erjian Construction Group Co., Ltd., the building area is 65783. Construction started on 17 June 2008 and completed on 15 September 2009. The construction industry has applied 9 items and 30 sub-items of 10 new technologies, reaching the leading level in China as a whole, and developed and applied the "manufacturing technology of large section I-beam webs plus large air duct holes" and "construction technology of prefabricated composite risers", which have been divided into provincial and national construction methods.
Suzhou Taihu Forum International Conference Center
Winning Time:2010year
Binglin Library, New Campus of Suzhou University
Winning Time:2007yearBinglin Library in the new campus of Suzhou University is a steel reinforced concrete frame-shear wall structure with an underground floor and eight floors above ground. It has a building area of 31074, a total height of 396 m and a total cost of 125 million yuan. The project started on 16 December 2004 and was completed and put into use on 20 September 2006. At the beginning of the project, quality planning should be carried out according to the quality target of creating "Luban Award". Detailed control should be paid attention to, and the word "essence" should be highlighted. In the construction of the project, 26 sub-items of the 10 new technologies of the Ministry of Construction and 3 other new technologies have been actively applied, and they have been awarded the fifth batch of demonstration projects for the application of new technologies in China and won the leading title in China.
Binglin Library, New Campus of Suzhou University
Winning Time:2007year
Comprehensive Business Housing of Suzhou State Tax Bureau
Winning Time:2004yearThe comprehensive business building of Suzhou State Tax Bureau is a frame structure building with three floors, one floor underground, six floors above ground and nine floors in part. The building area is 31810 feet and the total height is 42.6m. It is the only intelligent office building in Suzhou that integrates state tax service and office. The project started on December 8, 2000 and was completed and put into use on April 25, 2003. It has set up another modern landmark building for the ancient urban area of Suzhou.
Comprehensive Business Housing of Suzhou State Tax Bureau
Winning Time:2004year
Kunshan Shipai Substation
Winning Time:2003year500 kV Kunshan Shipai Substation is a large regional hub substation project connecting Jiangsu and Shanghai power grids. Civil construction adheres to high standards, strict requirements and strict quality control, which ensures the perfect function and stable and reliable operation of power stations, and reaches a new height of civil construction of substations in China's power system.
Kunshan Shipai Substation
Winning Time:2003year
Science and Technology Laboratory Building of Suzhou University
Winning Time:2002yearThe experimental building of Suzhou University covers an area of 23478 square meters. It has six floors of main building and seven floors of local building with basement. The plane shape of the building presents a "U" shape. The main axis is 118 m in length from east to west and 60.90 m in length from north to south. It has become a scene of the trunk road of Suzhou, an ancient city. The whole building is divided into six independent structural units by six "settlement-seismic joints". The main types of foundation are pre-stressed beam raft foundation, under-column independent foundation, composite beam raft foundation, etc. The upper structure is concrete and pre-stressed reinforced concrete frame structure, and the basement is a six-level civil air defense fortification. The project started on April 18, 2000 and was completed on May 28, 2001.
Science and Technology Laboratory Building of Suzhou University
Winning Time:2002year
Luban Award Suzhou New Town Garden Hotel
Winning Time:1999yearNew Town Garden Hotel project is a landmark building in Suzhou New Area with novel facade, elegant appearance and modern atmosphere. The total area of the project is 26749, which is composed of main building, skirt house and subsidiary room. The project was officially started on October 15, 1994, and was successfully completed on August 27, 1997, and delivered to the owner for use. After acceptance by the quality supervision station of the new area, it was assessed as a good grade, which fully meets the design requirements. In 1998, Xincheng Garden Hotel was awarded as a high quality project in Suzhou and Jiangsu Province.
Luban Award Suzhou New Town Garden Hotel
Winning Time:1999year
Mechanical and Electrical Installation Project of Yuanrong Square Project of High-speed Railway New Town
Winning Time:2017year
The Mechatronic Installation Project of Yuanrong Plaza of High-speed Railway New Town is located in the east of Min 6 Road, south of Nantiancheng Road, west of Minjinghe River and north of Qinglonggang Road in Xiangcheng District of Suzhou City. The total area of the project is 230052 square meters, and the cost of the project is 180 million yuan. The scope of contract is general contract of mechanical and electrical installation project.
Construction Unit: Suzhou Yuanrong Real Estate Development Co., Ltd; Construction Unit: Zhongyifeng Construction Group Co., Ltd.
Mechanical and Electrical Installation Project of Yuanrong Square Project of High-speed Railway New Town
Winning Time:2017year
Mechanical and Electrical Engineering of Xinguang Sanyue Department Store Suzhou New Project
Winning Time:2016year
Xinguang Sanyue Department Store is located in Hudong CBD area of Suzhou Industrial Park. Its total floor area is 162920.84 square meters, four floors underground, seven floors skirt building, 22 floors main building and 201 million yuan construction cost. The scope of contract is general contract of mechanical and electrical installation project.
Construction unit: Xinyue Department Store (Suzhou) Co., Ltd; Design unit: Suzhou Industrial Park Design Research Institute Co., Ltd; Supervision unit: Suzhou Industrial Park Construction Supervision Co., Ltd; Construction unit: Zhongyifeng Construction Group Co., Ltd.
Mechanical and Electrical Engineering of Xinguang Sanyue Department Store Suzhou New Project
Winning Time:2016year
Mechanical and Electrical Installation Engineering of Zhongsheng Ecological Building
Winning Time:2015year
The mechanical and electrical installation project of Zhongsheng Eco-building is located at the junction of Exhibition Road and Chengyi Road of Zhongxin Eco-Science and Technology City in Suzhou Industrial Park. The total area of the building is 101,473.86 square meters, with two floors underground and 23 floors above ground. The cost of the project is 89,028,800 yuan. The contract scope includes water supply and drainage installation works, electrical system installation works and HVAC works.
Construction Units: Sino-Singapore Suzhou Industrial Park Development Group Co., Ltd; Design Unit: Suzhou Industrial Park Architectural Design Co., Ltd; Supervision Unit: Jiangsu Jianke Construction Supervision Co., Ltd; Construction Unit: Zhongyifeng Construction Group Co., Ltd.
Mechanical and Electrical Installation Engineering of Zhongsheng Ecological Building
Winning Time:2015year
Installation Project of Area A1 and A3 of Pioneer Industrial Park
Winning Time:2014year
The installation works of the A1 and A3 districts of the creative industry park are located in the south of Yifang Road, east of Xinghu Street, north of Chuangyuan Road, 3286550 Falou, with an area of 43512.34 square meters, has one floor underground and five floors above ground. The contract scope includes mechanical and electrical, fire protection.
Construction Units: Suzhou Industrial Park Science and Technology Development Co., Ltd; Design Unit: Nanjing Nanfang Construction Supervision Consulting Co., Ltd; Design Unit: Suzhou Industrial Park Design Research Institute Co., Ltd; Construction Unit: Zhongyifeng Construction Group Co., Ltd.
Installation Project of Area A1 and A3 of Pioneer Industrial Park
Winning Time:2014year
Building 8 of Phase II Project of Jinji Lake Hotel
Winning Time:2013year
The mechanical and electrical installation project of No. 8 Building of Jinjihu Hotel Phase II in Suzhou Industrial Park is located in Guobin Road East, Dongyan Road South, East Hualin Street West, Dushu Hubei, with a total construction area of 34167.46 square meters, one floor underground and six floors above ground. It is a five-star state hotel with a construction cost of 56464.21 million yuan. The contract scope includes HVAC, water supply and drainage, electrical and fire protection works.
Construction Unit: Suzhou Industrial Park Construction Management Co., Ltd; Construction Unit: Zhongyifeng Construction Group Co., Ltd.
Building 8 of Phase II Project of Jinji Lake Hotel
Winning Time:2013year
N3 Mechanical and Electrical Installation Project of Times Square in Suzhou Industrial Park
Winning Time:2012year
The N3 project of Times Square in Suzhou Industrial Park is located in the east of Huachi Street and the south of Cuiyuan Road in Suzhou Industrial Park, with a total construction area of 78,000 square meters and a construction cost of 33.13 million yuan. The contract scope covers mechanical and electrical installation construction (including water supply and drainage, electrical spraying, air conditioning, ventilation, etc.) and general contract management services.
Construction Unit: Suzhou Yuanrong Development Group Co., Ltd; Construction Unit: Zhongyifeng Construction Group Co., Ltd.
N3 Mechanical and Electrical Installation Project of Times Square in Suzhou Industrial Park
Winning Time:2012year
Mechanical and Electrical Installation Project of Dushu Lake Yinrui Hotel
Winning Time:2012year
Dushu Lake Yinrui Hotel Project of Suzhou Industrial Park is located in the west of Xinghu Street, east of Dushu Lake and south of Cuiwei Street in the Higher Education District of Suzhou Industrial Park, with a total construction area of 60,000 square meters and an engineering cost of 82.62 million yuan. The contract scope includes mechanical and electrical, fire protection.
Construction Units: Suzhou Industrial Park Yinrui Asset Management Co., Ltd; Design Unit: Suzhou Industrial Park Design Research Institute Co., Ltd; Supervision Unit: Suzhou Park Supervision Co., Ltd; Construction Unit: Zhongyifeng Construction Group Co., Ltd.
Mechanical and Electrical Installation Project of Dushu Lake Yinrui Hotel
Winning Time:2012year
Suzhou science and technology Xintiandi apartment building project
Winning Time:2009yearThe building area is 54391 square meters, two floors underground and twenty-four floors above ground. The total height of the building is 95.8 meters. It is a multi-functional building with hotel apartment as the main part and commercial supporting as the supplement. The hotel apartment building has a total of 24 floors. This project all adopts fair-faced concrete formwork system, the whole project does not do secondary decorative plastering, the structure takes shape once, which avoids the hollowing and cracking of plastering and saves the cost. The exterior facade of this project is curved, and the large facade is decorated by various curtain wall forms. The whole aluminium panel curtain wall is equipped with color lines and color blocks that protrude the wall, as well as some glass curtain walls and stone curtain walls. The use of various curtain walls makes the whole building three-dimensional and colorful.
Suzhou science and technology Xintiandi apartment building project
Winning Time:2009year
New Office Building of Suzhou Banking Park
Winning Time:2013yearLocated in the north of Zhongyuan Road and east of Wansheng Street, Suzhou Industrial Park is one of the landmark buildings of Suzhou Industrial Park. The project is divided into two parts: the main building and the skirt building. The total area of the building is 70040.19_with 23 floors above ground and an area of 48618.52. The second floor of the underground is a parking lot with an area of 20969.80. The total height of the building is 99.90 m and the highest structure is 111.2 M. Tightly organized and carefully managed in technical innovation, quality control, safety and civilization, and passed the acceptance on April 28, 2012. During this period, the project has won awards such as "AAA Class Safety, Civilization, Standardization and Integrity Site in 2011", "Jiangsu Excellent Survey and Design Award", "The 17th batch of Jiangsu Province Construction Industry New Technology Application Demonstration Project in 2012", "Yangtze Cup of Jiangsu Province Quality Project in 2014", "Zijin Cup of Jiangsu Province Construction Decoration Quality Project".
New Office Building of Suzhou Banking Park
Winning Time:2013year
Suzhou Science and Technology Park Phase I Office Building
Winning Time:2017yearSuzhou Science and Technology Park Phase I Office Building
Winning Time:2017year
Suzhou Yuanrong Building
Winning Time:2011yearThe skirt building is fan-shaped, the main building is Y-shaped, the outer arc radius is 39 m, and the core tube is circular with a radius of 12 M. The building area is 81942, 18 floors above ground, 79.1 m high and 1 floor underground. The unique shape and novel layout of the project have established the complex coordinate system of the plane axis of the building and the various characteristics of the three-dimensional structure. Therefore, the construction survey, especially the positioning and alignment of the plane and the transmission of the axis are one of the difficulties of the project. Foundation construction of deep foundation pit in main building, anti-cracking measures of super-thick floor and wall, pouring methods and measures of mass concrete floor are the second difficult points of this project. The third difficulty of this project is to install curtain wall with unit glass curtain wall and aluminium panel curtain wall, skirt house with granite veneer, and curtain wall with arc shape of external facade.
Suzhou Yuanrong Building
Winning Time:2011year
Suzhou Dongshan Hotel Phase III Complex Building Project
Winning Time:2007yearThe construction area of the project is 14967.1_, the East-West length of the building is 118.5 m, and the North-South width is 70.251 M. Local underground layer 1, above ground layer 3. Construction started on April 13, 2005, passed the main acceptance on September 9, 2005, and completed acceptance on September 15, 2006. There are 450 *1500 beams with 18 m span on the inclined roof of reception hall, and the net height of the beams is 15.57 M. The new formwork system of adjustable bracket support and laminated plywood is adopted in construction. Open joint-retaining dry-hanging stone curtain wall requires high quality perception. We adopt back-bolt construction technology to maximize the adjustment of stone installation. The project passed the acceptance of Jiangsu New Technology Application Demonstration Project in November 2006. The expert group agreed that the overall level of the project's popularization and application technology reached the advanced level in China.
Suzhou Dongshan Hotel Phase III Complex Building Project
Winning Time:2007year
Lifu Square, Suzhou
Winning Time:2012yearLocated in the north of Wangdun Road and east of Huachi Street, Suzhou Industrial Park, it covers an area of 5.32 hectares, with a total floor area of 165889 square meters, about 290 meters long and 125 meters wide. Four floors above ground and two floors below ground. Shoppingmall, which integrates catering and commerce, is one of the landmark buildings along Jinji Lake in Suzhou Industrial Park. Construction started on June 18, 2006 and completed on February 5, 2010. The foundation consists of 2465 precast concrete Uplift-Resistant square piles with a length of 15 meters and 450 mm by 450 mm. The main structure concrete is C40. The cast-in-situ reinforced concrete slab is used. The typical floor thickness is 120 mm. The superstructure is divided into two structural units with the length of 120 m and 145 m respectively by setting anti-seismic joints. In order to enhance the bearing capacity and ductility, concrete filled steel tubular columns are used in the surrounding columns of large space, steel reinforced concrete beams are used in the surrounding beams, and H-shaped steel beams are used in the roof beams of buildings to reduce the beam height to meet the service requirements.
Lifu Square, Suzhou
Winning Time:2012year
Changshu Public Security Bureau Command Center Project
Winning Time:2007yearChangshu Public Security Command Center is composed of two towers which are independent of each other's functions but combined in form. Its building area is 32500. The building adopts more advanced intelligent building system to achieve intensive and energy-saving control. During the construction of the project, the project department establishes the quality management system with the guiding ideology of "detailed management, process management", establishes and controls the quality objectives of each sub-item scientifically and strictly, and creates conditions for the project to achieve excellence. The overall technology of the project has reached the advanced level in China. Through the popularization and application of new technologies, new materials, new processes and new equipment, it has laid a foundation for engineering excellence.
Changshu Public Security Bureau Command Center Project
Winning Time:2007year
CASE SHOW
SUPER HIGH-RISE BUILDING
PUBLIC BUILDINGS
INDUSTRIAL BUILING
DECORATION
RESIDENTIAL HOUSE
STEEL STRUCTRE
ELECTROMECHABICAL INSTALLATION
WATER RESOURCES RESOURCES AND HYDROPWER
EPC/PPP
ROAD TRAFFIC
MUNICIPAL PUBLIC
RAIL TRANSIT
BRIDGE TUNNEL
GREEN BUILDING/ASSEMBLING
UNDERGROUND SPACE
UNDERGROUND INTEGRATED PIPE GALLERY
ANCIENT ARCHITECTURE GARDEN
ENVIRONMENTAL PROTECTION INDUSTRY
SPOMGE CITY
Zhongyifeng Construction Group Co., Ltd. 苏ICP备000000号-1